ROAD AND TRAFFIC INDEX
Lemery, Batangas
LEMERY, BATANGAS
SURVEYED PAVEMENT DISTRESS IN SANGALANG STREET
Defect(s)/Deficiencies Estimated Quantity Unit of Measure Remarks Length Width Depth No. of Slab Latitude Longitude
Cemetery/L/S 1 13.886322 120.909857
transverse crack 6 l.m 6 m 4 cm 3.5 cm 16 13.885808 120.909862
P. Gomez St/In 31 13.885255 120.910191
Minor Worn out / Block Crack 83.7 sq. m 34 to36 13.8851487 120.910197
Lateral Crack 6 l.m 6 m 25.5 cm 1.5 cm 34 13.8851487 120.910197
Minor Worn out / Block Crack 139.5 sq. m 38 to 42 13.8848564 120.9104009
Rehabilitated Pavement 43 to 46 13.8848564 120.9104009
Inlet Crack 1 l.m 1 m 1 m 15 cm 46 13.8847313 120.9104601
Minor Worn out 55.8 s.q m 47 to 48 13.8847313 120.9104601
Marasigan St/In 48 13.8847313 120.9104601
Minor Worn out 613.8 s.q m 49 to 70 13.8847313 120.9104601
Pothole / Delamination 3.2634 s.q m 2.22 m 1.47 m 1 cm 54 13.8846503 120.9105591
Edge Break 9 s.q m 6 m 1.5 m 1.5 cm 57 13.88454 120.9106374
Rehabilitated Pavement 71 to 82 13.8838721 120.9110752
Major Worn out 697.5 s.q m 83 to 107 13.8833692 120.9112963
Rajah Matanda St/In 83 13.8833692 120.9112963
Potholes 7.5 s.q m 3 m 2.5 cm 83 13.8833692 120.9112963
Minor Worn out 809.1 s.q m 108 to 136 13.8825501 120.9118899
Noble St/In 121 13.8825501 120.9118899
Lakandula St/In 136 13.881559 120.9126279
Corner Crack 1.82 l.m 1.82 m 1.58 m 1.5 cm 136 13.881559 120.9126279
Major Worn out 27.9 s.q m 137 13.881559 120.9126279
P. De Joya St/In 154 13.8808782 120.9130071
Delamination 3.51 s.q m 3 m 1.17 m 0.5 cm 157 13.8808782 120.9130071
Rehabilitated Pavement 157 to 173 13.8801865 120.9134481
Bonifacio St/In 171 13.8801865 120.9134481
Extreme Worn out 111.6 s.q m 174 to 177 13.8801865 120.9134481
P. Burgos St/In 188 13.8801865 120.9134481
Minor Worn out 1701.9 s.q m 208 to 269 13.8790842 120.9141901
Edge Break 7.02 s.q m 6 m 1.17 m 5 cm 207 13.8790842 120.9141901
Gen. Luna St/In 207 13.8790842 120.9141901
J. P Rizal St/In 227 13.8784243 120.9145774
Corner Crack 1.37 l.m 1.37 m 1.04 m 5 cm 229 13.8783929 120.9146053
Hump Distress 5.52 s.q m 6 m 0.92 m 5 cm 230 13.8783432 120.9146982
Corner Delamination 1.0296 s.q m 1.17 m 0.88 m 2 cm 237 13.8780021 120.9148683
Mabini St/In 243 13.8778451 120.914975
Corner Delamination 0.215 s.q m 0.5 m 0.43 m 253 13.8774418 120.9152227
/E 269 13.8768455 120.9155973
Note: Legend: /S - Start
1. The data is surveyed last February 23, 2022. /E - End
2. The first remark indicates the landmark where pavement distress survey started. /In - Intersection
3. The unit of measure l.m denotes linear meter. /L - Landmark
CONTACT US
GOVERNMENT DIRECTORY
Lemery Engineering Office,
Ilustre Ave., Lemery, Batangas
pmsgislemery@gmail.com